• Manufacture Alloy Lron Link Chain for Lifting and Mine
  • Manufacture Alloy Lron Link Chain for Lifting and Mine
  • Manufacture Alloy Lron Link Chain for Lifting and Mine
  • Manufacture Alloy Lron Link Chain for Lifting and Mine
  • Manufacture Alloy Lron Link Chain for Lifting and Mine
  • Manufacture Alloy Lron Link Chain for Lifting and Mine

Manufacture Alloy Lron Link Chain for Lifting and Mine

Usage: Transmission Chain, Drag Chain, Conveyor Chain, Dedicated Special Chain, Link Chain
Material: Iron
Surface Treatment: Electroplating
Feature: Heat Resistant
Chain Size: 1/2"*3/32"
Structure: Welded Chain
Samples:
US$ 0/Meter 1 Meter(Min.Order)
| Request Sample
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
Customization from Samples
The supplier provides sample based customization services
100% Finished Products Inspection
The supplier inspects 100% of finished products.
to see all verified strength labels (22)

Basic Info.

Model NO.
DIN766/DIN764/DIN763
Color
Solid Color
Stock
There Are Emergency Stocks for Regular Sizes.
Sample
The Sample Is Free, The Freight Should on Youracco
Transport Package
Bag, /Plastic Drum/Iron Drum/Wooden Cases
Specification
1mm-30mm
Trademark
YT
Origin
Linyi of Shandong, China
HS Code
73158200
Production Capacity
500ton/Month

Product Description

1.How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. Free for the samples, but you need to pay for the freight.
2. What's your quality guarantee?
We have different kinds of products which can meet different quality standard.
Our QC department will teset products before shipping. We have 100% quality guarantee to customers. We will be responsible for any quality problem.
3. How about the delivery time?
The delivery time is depend on the products and the quantity. But generally, the delivery time for a container is about one month.
4. What's benefit will you bring?
Your client satisfied on the quality

Manufacture Alloy Lron Link Chain for Lifting and Mine

BUSINESS FAQ: 

1) What is the MIN order quantity ?
 usually 1 ton.

2)What is the delivery time?
15 -20 days since received the deposit.

3)What is the Payment term?
A. 20% in advance ,80%  in bill of   lading
B. Irrevocable L/C at sight.
C. Other payment can be negotiated.

4)Could I get free samples before first cooperation? 
Yes, of course! But the buyer need to afford express fee, which is returnable once we build cooperation.

5)What's the packing method?
5/50 kg one Gunny bag, several bags on one
Pallet(500kg one iron drum, 2drums on a iron
Pallet; Plastic drum+pallet; Plastic/wooden
Roll+pallet.Special packages are available upon customers'need. You can contact us for special or more detailed packages.


Manufacture Alloy Lron Link Chain for Lifting and Mine
Manufacture Alloy Lron Link Chain for Lifting and Mine
Manufacture Alloy Lron Link Chain for Lifting and Mine
We are more professional and careful. I believe we will satisfy you and we will be your best choice!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
26
Year of Establishment
2015-07-07